In the state of California, commissioning is required per the CALGreen building code (section 5.410.2) for all newly constructed, non-residential buildings over 10,000 square feet.
In the state of California, commissioning is required per the CALGreen building code (section 5.410.2) for all newly constructed, non-residential buildings over 10,000 square feet.